Repowering turbines
Repowering turbines
Vestas V90 3MW
2 Psc. Vestas V90 3MW the turbines are in good condition. Service has been done according to Full service contract AOM5000 by Vestas.
Both Wind turbines have new nacelles installed in 2004 and 2006 respectively.
Inquiry for Vestas V90 3MW
| Model: | Vestas V90 MKIII, MKIV |
| Built year: | 2002, 2003 |
| Nominel effect: | 3000kW |
| Hub height (m): | 80m |
| Pieces: | 2 |
| Available: | April 2019 |
| Voltage/grid frequency: | 20kV/50hZ |
| Power control: | Pitch |
| Transformer station: | Inclusive |
| Rotor diameter (m): | 90m |
Pre-Inspection and Assessment:
Each product undergoes a thorough initial assessment to evaluate the condition of key components. This ensures we identify and address any issues before starting the refurbishment, maintaining high quality standards.
Refurbishment
Throughout the refurbishment process, components are carefully tested and reconditioned. Quality control checkpoints ensure that all repairs and replacements meet original specifications and operational standards.
Final Testing and Certification
After refurbishment, the products undergoes rigorous final testing to simulate real-world conditions. This ensures that it meets all safety and performance criteria before approval for delivery.


















































