Repowering turbines

2 x Vestas V52 Hubheight 74m. Builtyear 2007

Get Inquiry Download PDF

Model:Vestas V52
Rotor diameter (m):52m
Built year:2007
Nominel effect:850kW
Hub height (m):74m
Pieces:2
Available:Q3 2026
Voltage/grid frequency:20kV/50hZ
Power control:Pitch
Transformer station:Inclusive

Pre-Inspection and Assessment:

Each product undergoes a thorough initial assessment to evaluate the condition of key components. This ensures we identify and address any issues before starting the refurbishment, maintaining high quality standards.

Refurbishment

Throughout the refurbishment process, components are carefully tested and reconditioned. Quality control checkpoints ensure that all repairs and replacements meet original specifications and operational standards.

Final Testing and Certification

After refurbishment, the products undergoes rigorous final testing to simulate real-world conditions. This ensures that it meets all safety and performance criteria before approval for delivery.